| Plan | ✓ Professional ✓ Advanced ✓ Scale ✓ Enterprise |
Tasks are where the actual work gets tracked in Vista Work. Each task can carry assignees, priority, tags, due dates, a description, subtasks, checklists, attachments, and comments.
Creating a task
1. Open a project in Work.
2. Select the status you want the task to start in and add a title.
3. Open the task to fill in the details.
Fields you can set on a task
- Assignees: the teammates responsible for the task. You can add more than one
- Priority: flag how urgent the task is (Low, Medium, High, or Urgent)
- Tags: tag tasks for easier filtering
- Due date: when the task needs to be done
- Description: supports pasting in formatted text, so content drafted elsewhere keeps its formatting
Subtasks, checklists, and attachments
- Break a task into subtasks that each move through their own status
- Add a checklist for step-by-step items within a task
- Attach files the same way you would anywhere else in Vista Social, up to 20 MB per file
- Mention teammates in comments to loop them in, they'll get notified
How to ask Vista from task comments
Mention @Vista in a task comment and Vista does the work right in the task, so you don't have to leave Work.
- Open the task and click the comment box under Activity.
- Type @ and choose Vista.
- Write what you need and send the comment.
Vista replies in the thread and makes the change. Each update also shows in the task activity, so your team can see what changed.
Example requests:
- "@Vista set the priority to High and add a due date for this Friday"
- "@Vista add the Seasonal drinks tag to this task"
- "@Vista move this task to In progress"
How to share a task
Click Share in the task's actions menu to send it to a client or a freelancer who doesn't have a seat. The link always shows the title, status, priority, dates and description. Checklist, attachments and subtasks are on by default. Assignees, tags, custom fields and activity stay off unless you turn them on. With comments on, their replies land in the task's comments under External. Learn more in Share anything with a link and get feedback.
Notifications
Task notifications are on by default for the items your team is most likely to need right away, and off by default for lower-priority updates. You can adjust what you're notified about in your account notification settings.
Best practices
- Set a due date and priority on anything time-sensitive so it doesn't get lost in the board
- Use checklists for multi-step tasks instead of creating a subtask for every small step
- Paste formatted notes or briefs directly into the description instead of retyping them
Frequently Asked Questions
Q: Can a task have more than one assignee?
A: Yes. You can assign a task to as many teammates as you need. Use subtasks if you want to split the work into separate pieces.
Q: Can a client see who on my team is assigned to a task?
A: Not unless you turn on Assignees when you share it. Teammates who do appear show by first name and picture only, never their email.
Q: Will I be notified about every change to a task?
A: Higher-priority notifications are enabled by default, while lower-priority ones are off by default so your notifications don't get overwhelming. You can adjust these in your notification settings.
Q: Can I move a task between statuses without opening it?
A: Yes. You can drag a task card between statuses directly on the board.
Need help?
Reach out to our support team, and we are happy to help.
Related Reading:
Getting started with Vista Work
Creating and managing projects and statuses in Vista Work
Sign up now and try Vista Social for 14 days, free!